Construction of the 18,400 sq. ft. addition took
place without disrupting Tufts production schedule
A fire sprinkler system was installed in the new
building including a retro-fit into the existing
building to meet current fire codes
A 7-1/2 ton capacity, heavy duty, double girder,
top running crane with a 95 ft. span was installed
Special structural engineering was used to create
a large clear span opening into the existing building
|